Why yes, that is my Hidcote shawl in use. Still not great at the wearing of shawls, I feel all goofy and don't know how to move my arms, but I'll get used to it.Just to get all the shamelessly cute pictures together, Friday I went out to play with the nephews, I love that it's getting spring-like enough to go outside a bit.


Onto the fiber. With no knitting last week, I was amazingly productive with the spinning wheel. Case in point - the Redwood Forest BFL. Finally done. Well, except for a good soak. I spent most of Friday night plying. Seriously. I spent about 6 hours plying it up. Oi. But, it turned out better than I had hoped for. Definitely a fingering weight (what I use for socks) pending how much it blooms during its soak. 
I'll take a wraps/inch measurement after the soak. Should probably re-figure the yardage then too. As of right now I've got 570 yards. I'm pretty dang pleased. This won't be knit into socks however - it's not superwash and I'm not keen on a pair of handspun socks felting with the first wash. So I'll have to figure something else out. I still have some more singles left as well, not sure what to do with them. I might just take the easy road and 2 ply them, won't end up with much but I don't know what else to do. Hmmm.

I also managed to get a lot done on the blanket for my soon-to-be niece. No pictures until it's gifted though. Need to keep working on it so it's done by her birth day. I plan on her being the only one of her siblings to get the blanket on time. Elliott was born earlier than planned, and I couldn't finish it before the shower the next day. Mason's blanket was delayed by a yarn shortage. So she will get her blanket on time.

I also managed to get almost the first half of the Air Fiber spun up. I say almost half, because I split it into 2 equal parts, but the first half didn't all fit onto one bobbin.

That's a very full bobbin. Had I tried to get any more on, it would have impeded the spinning of the wheel. So now I just have get the rest of the BFL single off the bobbins and get going with the second half. PS - it's really really thin!

Last Monday, I spent the night at Bridget's Seamus sitting, so I took along my spindles and the Terminus BFL. Yeah, haven't mentioned that in a while. A long while. Anyway, I managed to ply up the spindle full that had been sitting and waiting patiently for me to get around to it.

And then I wound off the spindle full that I had and started a new spindle full, which I'm hoping is the last spindle full. Today when I went to take the spindle out to photo - tragedy. Tuesday when I was carrying everything into the house, I had dropped the spindle box, straight down. I winced at the time, but didn't really worry too much. When I went to pull out the spindle off plied yarn today... the spindle came apart. The whorl and and yarn stayed behind and the shaft came right out. AAAAHHHH! Mom and I managed to put it back together and it wasn't broken or anything, just heart attack inducing at the time. Reminder to self, be nice to the spindles.
I also managed to get a lot done on the blanket for my soon-to-be niece. No pictures until it's gifted though. Need to keep working on it so it's done by her birth day. I plan on her being the only one of her siblings to get the blanket on time. Elliott was born earlier than planned, and I couldn't finish it before the shower the next day. Mason's blanket was delayed by a yarn shortage. So she will get her blanket on time. Alright, onto the little bit of knitting I got done yesterday. I finished the first of the Rivendell socks, except for the kitchenering of the toe and sewing in the ends. 


And then I got through the gussets of the second Interlocking Leaves sock.
I'm feeling the socks right now. Should crank out the Interlocking Leaves sock this week. And now that I've said that it won't happen.
And now I need to go eat lunch and go to work. Baseball game today, it'll be a cold one!





